Skip to main content
Loading…
This subsection is included in your selections.

a. For Governmental Bodies. A grantee is required to remove, relay, and relocate its cable system at its expense whenever the City (on its own behalf or on behalf of an assessment district) or any authorized governmental body requires it to do so for reasons of traffic conditions; public health and safety, and protection of property; or because the City or authorized governmental body elects to change or alter the grade, align or widen a street, or sell or vacate any street or public property, to move any building or structure, or to construct, operate, or repair any water pipes, lines, or mains, sanitary and storm sewers, watercourses, drainage ditches, conduits, playgrounds, power lines, tracks, traffic control devices, or other public improvement, public utility, public structure or facility, which change, alteration, sale, vacation, movement, construction, operation, or repair will be aided by removal, relaying, or relocation of a grantee’s cable system. An affected grantee shall be given written notice requesting the removal, relaying, or relocation of its cable system at least fifteen (15) days in advance of the date removal, relaying, or relocation of the cable system must be completed.

b. For Other Authorized Entities. If any removal, relaying, or relocation is required to accommodate the construction, operation, or repair of the facilities of another person which is authorized to use the streets or public property, a grantee shall, after at least fifteen (15) days advanced written notice, take action to implement the necessary changes requested by the responsible entity. The City may resolve disputes as to responsibility for costs associated with removal, relaying, or relocation of facilities among entities authorized to install facilities in the streets or on public property if such entities are unable to do so themselves.

c. For Third Persons. A grantee shall, upon the request of any person holding a building moving permit issued by the City, temporarily raise, lower, relay, relocate, or remove its wires, cables, and other facilities to accommodate the moving of the building, as the grantee shall determine. The expense of such temporary raising or lowering, relaying, relocation, or removal of a grantee’s facilities shall be paid by the person requesting the same, and the grantee shall have the authority to establish the reasonable cost of such changes and require such payment in advance. A grantee shall temporarily move its cable system as required under this subsection 12-14.4c. if required payments are made and the grantee is given at least forty-eight (48) hours advance written notice to arrange for such temporary changes. (Ord. #80-97, S14)